Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13571717

- Product Categories
- Thin coating of epoxy floor..
- Type epoxy mortar floor sys..
- Self-leveling epoxy floor s..
- Anticorrosive epoxy floor s..
- Anti-static epoxy floor sys..
- Sealed concrete curing floo..
- Carborundum wearable Floor ..
- Do not get angry resistant ..
- Friendly Links
- home > Supply > Which is good Jintan Epoxy construction on the election Changzhou Investor painting engineering company 15,189,710,951 professional quality lowest price once put aftermarket industry for life, and one-stop service in the end
Which is good Jintan Epoxy construction on the election Changzhou Investor painting engineering company 15,189,710,951 professional quality lowest price once put aftermarket industry for life, and one-stop service in the end
Information Name: | Which is good Jintan Epoxy construction on the election Changzhou Investor painting engineering company 15,189,710,951 professional quality lowest price once put aftermarket industry for life, and one-stop service in the end |
Published: | 2014-10-16 |
Validity: | 30 |
Specifications: | 25 kg |
Quantity: | 1000000.00 |
Price Description: | |
Detailed Product Description: | Ping a system characterized by thin coating of epoxy to a thickness 0.5-0.8mm; 2, the general life span of 3-5 years. 3, suitable for industrial plants, offices, supermarkets, parking lots and other places, in cement (concrete), terrazzo, on the basis of the ground emery old painting. Second, the performance characteristics of a surface paving process seamless, beautiful and bright, color variety, no dust, easy to clean; 2, excellent wear resistance, corrosion resistant mild chemicals. 3, epoxy floor coating thin quartz sand mixed with the epoxy coating or mortar trowel scraping roll as middle material, can be very good to improve the flatness of the ground, and can enhance the coating thickness. 4, economical and practical, quick construction and easy maintenance. Third, the construction of the conservation period: For new concrete floor or a new terrazzo floor, the conservation of more than 28 days, the moisture content of 8% or less. Strength: C-25 or more. Moisture content: 8% or less. Flatness: 2-3mm / 2M or less. Indoor ambient humidity 85%, the best construction temperature above 10 ℃. Fourth, construction tools floor polishing machines, vacuum cleaners, serrated trowel, flat scraper, roller and paint brush, mortar mixer, the substrate surface temperature and ambient temperature and humidity, substrate moisture analyzer, weighing and mixing tools , cut sewing machine and glue gun, cleaning tools. Five, Construction Technology 1, vegetarian deal: according to the situation plain good repair, sanding, dust; 2, epoxy primer: The exceptionally strong adhesive closure and an epoxy primer roll, enhanced surface adhesion; 3, Epoxy coating: epoxy resin adding an appropriate amount of quartz sand, with a trowel to evenly coating the number of road; 4, epoxy putty: according to the actual needs of the number of road construction, required to achieve smooth and no holes, no batch knife India and sanding Indian prevail; 5, epoxy finish: epoxy paint or solvent-based paint roller second slip road, after the completion of the overall surface bright and clean, color uniform, no hollowing; 6, construction complete: 24 hours before the Master, seven days before the weight. (25 ℃ prevail, low temperature required to appropriately extended opening hours) six, Construction Notes 1, basic floor sanding, repair, cleaning up after the strength of the foundation in the ground up to C25 or more, or less flatness 2-3mm / 2M, ground no oil, other chemical residues. 2, after applying each coat finish Note detect surface conditions, there are no drawbacks to produce, every construction is not easy too thick a coating, construction efforts in uniform, must be fully cured after, before they can enter the next process. 3, the required floor paint material standard ratio ratio, stir evenly. Seven pilot projects technical indicators index drying time, H is dry (H) drying time, H is dry (H) time hard work (H) adhesion, pencil hardness level ≤1 ≥2H impact resistance, Kg? Cm 50 through flexible of 1mm by abrasion (750g / 500r, weight loss, g) ≤0.04 water resistance 48 hours no change resistance 10% sulfuric acid was unchanged 56 days 56 days 10% sodium hydroxide resistant unchanged resistance to gasoline, 120 # 56 days significantly No change No change-resistant lubricants 56 days Note: All tests (except for drying time) is cured for 7 days after (25 ℃ eight, the scope of electrical, electronics, machinery, food, chemicals, tobacco, beverages, textiles, clothing, furniture, plastics, sports goods and other manufacturing plants workshop cement or terrazzo floor. nine, conservation introduce a suggested pedestrians wear soft-soled shoes (if field conditions allow), before entering the industrial floor area to be cleaned, such as clean sand on the hard soles the pledge to reduce scratches and sharp objects on the floor surface. 2, carrying goods as far as possible light give light, to prevent heavy impact on the ground, in order to avoid man-made damage. 3, epoxy floor workshop on the road to Note that the speed is not too fast, so as not to compete braking caused by the behavior of shear heat is too high, so that the epoxy floor paint instantly softened (epoxy floor paint softening temperature around 80 ℃, so the use of ambient temperature control in 50 ℃ below) and produce difficult to clean dirty under the action of shear force. 4, available daily cleaning floor cleaning machine or a wet cloth to wipe, you can choose a neutral detergent, the detergent can also be used in smaller concentrations are generally added cleaning solution made of water, and then use the dirt floor cleaning machines or wash cloth to mop the floor surface and wash again with water, dry ground; note floor paint edge portion of a long time not to have water 5, no. Regular waxing (usually once a month to waxing), it is recommended to use special floor wax or emulsified water-based wax; first use floor cleaning machines or cotton swab to clean and wipe the floor, then waxing fight. wax treatment can increase the wear resistance of any flooring material and scratch resistance. 6, avoid using heavy tools or tap the ground, nor directly on the epoxy floor dragging heavy loads. 7, to avoid heavy corrosion medium long soak floor paint, if not careful corrosive acid spilled, be sure to promptly clean up acid medium. |
Admin>>>
You are the 21760 visitor
Copyright © GuangDong ICP No. 10089450, Changzhou Investor Painting Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21760 visitor
Copyright © GuangDong ICP No. 10089450, Changzhou Investor Painting Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility